CP Organoclay supplies Venezuelan oilfield service contractors and PDVSA supply chain companies with organophilic clay for oil-based drilling muds. Direct Chinese manufacturer. 20+ years export experience. Venezuela's Orinoco Heavy Oil Belt — the world's largest heavy crude accumulation — creates unique OBM formulation demands that CP-982 and CP-992 are specifically designed to meet. CIF Puerto Cabello in 30–38 days. 20,000 MT/year capacity. ISO 9001:2015 certified. API 13A-tested drilling grades.
| Application | Basin / Field | Recommended Grade | Treat Rate |
|---|---|---|---|
| Standard OBM Viscosifier | Maracaibo Basin, Eastern Venezuela | CP-982, CP-992, CP-34 | 5–15 kg/m³ |
| Heavy Oil Belt OBM | Orinoco Faja (FPO) | CP-982, CP-992 | 8–15 kg/m³ |
| HTHP Deep Wells | Deep formations, offshore | CP-EL, CP-GL | 5–12 kg/m³ |
| Invert Emulsion Mud | All Venezuelan basins | CP-34, CP-982 | 5–10 kg/m³ |
| Factor | CP Organoclay | Details |
|---|---|---|
| API certification | API 13A tested | Test reports provided with each drilling grade shipment |
| Quality system | ISO 9001:2015 | Batch COA documentation for every shipment |
| Drilling grades | CP-982, CP-992, CP-34, CP-EL, CP-GL | Standard OBM through HTHP applications |
| MOQ | 1 FCL (17–20 MT) | LCL from 500 kg for initial trials |
| Documentation | COA, SDS, API 13A, CI, B/L, cert. of origin | Full package for customs and operator approval |
| Export experience | Latin America, Middle East, Africa, Central Asia | Familiar with complex export markets |
The Faja Petrolífera del Orinoco — the world's largest heavy crude accumulation — requires OBM systems formulated for high-density, high-viscosity crude extraction and upgrading operations. Organoclay viscosifiers must maintain rheological properties in the high-density mud systems used across this region. CP-982 and CP-992 provide reliable yield point and gel strength build-up in diesel and mineral oil-based mud systems. CP-EL addresses deeper or higher-temperature formations. API 13A test reports available for all drilling grades.
Lake Maracaibo and the surrounding onshore fields are among South America's oldest and most prolific petroleum regions. OBM systems in Maracaibo wells typically use CP-34 or CP-982 for standard viscosification. Deeper formations may require CP-EL for enhanced thermal stability. PDVSA contractor qualification documentation provided on request.
| Port | Transit Time | Region Served |
|---|---|---|
| Puerto Cabello | 30–38 days | Main industrial port, national distribution |
| La Guaira (Caracas) | 31–38 days | Capital region, Caracas |
| Maracaibo Port | 32–40 days | Maracaibo Basin oilfield region |
| Air courier (samples) | 5–8 business days | Caracas, Maracaibo, Barcelona (Anzoátegui) |
Related pages: Organoclay for Oil Drilling · Organoclay Supplier Colombia · Organoclay Supplier Brazil · Organoclay Supplier South America · Organoclay Supplier Nigeria · Trade Info & HS Code
Tell us your OBM system requirements (grade, mud weight, temperature rating), quantity, and delivery port — we provide pricing and technical specifications within 24 hours.
We reply within 24 hours on business days.
Thank you! Your inquiry has been received.
We'll get back to you within 24 hours.
WeChat ID
0086-13185071071